J. Riley Roofing & Gutters explains a siding project before it starts, so the homeowner knows what happens each day, and the crew keeps the site tidy as it goes.

Phone 940-456-9905, to ask how a siding job would go at your house.

The Scope of the Trade

The trade covers the layers behind the siding too, including house wrap, flashing and repairs to the sheathing, and the job is mostly carpentry, with a lot of measuring. The condition of the wall behind the siding often decides how much extra work is involved, and a straightforward repair may be quick.

Reading the Exterior Before Quoting Materials

Photographs record the present state of the siding, trim and any damage, so everyone shares the same picture, and the homeowner is welcome to point out any concerns. The condition of the trim, soffit and fascia is checked, as these are often replaced along with the siding, and the list of extra items becomes part of the plan.

What a Clear Plan for a Siding Job Includes

A clear written plan names the siding material, the profile, the color and the manufacturer's product line, and anything that is not in the plan is open to question. Contact details for the person in charge on site help to keep communication simple, and one point of contact makes the job smoother.

Stripping a Wall to the Sheathing

Old siding is removed section by section, starting at the top and working down, so debris falls away from the wall, and the crew keeps a close eye on the weather. The exposed wall is photographed, which gives a record of the findings and the repairs, and extra repairs are explained before they are done.

Building the Drainage Plane

House wrap is applied over the sheathing, starting at the bottom and lapping each course over the one below, and each layer is installed in shingle fashion. Any last repairs are made before the siding begins, and preparation takes as long as the siding on some houses.

Trim, Gables, Bays and Penetrations

Utility fixtures, such as hose bibs, electrical boxes and dryer vents, need mounting blocks or neat cut-outs, and a neat cut shows careful work. Hose bibs and vents get a neat seal, and the opening is caulked so no water can enter, and extra care is needed where two trades meet.

How Panels and Boards Go on the Wall

Siding is installed from the bottom of the wall to the top, with each course overlapping the one below it, and the pattern is worked out in advance around windows. Fiber cement is nailed or screwed firmly to the studs, with the fasteners placed in the marked zone, and a loose panel will rattle in the wind.

Trim, Caulk and Finishing Touches

Cut ends and edges of fiber cement and wood are primed and painted to resist moisture, and too much caulk is a sign of poor fit. Gutters and downspouts that were removed are put back, aligned and checked for flow, and what looks fine at noon may look different in the evening.

Day by Day on the Job

A lead or foreman directs the work, and a small team handles cutting, fastening and trim, and a tidy site is a good sign. Weather affects the schedule, since wet walls cannot be sealed properly and high winds make large panels dangerous, and the crew should be flexible about start dates.

What You Can Do to Make the Job Go Smoothly

Before work starts, the crew covers shrubs, air conditioners, patios and other items near the walls with tarps or plywood, and a tidy site is part of professional work. Electrical work is not part of siding, though fixtures and outlets are removed and replaced with care, and unusual finds should be explained to the homeowner.

Staging the Job Before the First Panel

Siding is usually delivered a day or two before work begins, in bundles or boxes that are stacked near the walls, and color lots should match, since a mismatch is hard to hide. Waste is part of every siding job, since boards are cut to length and panels are trimmed around openings, and the order should be checked against the plan before work begins.

Matching Old Walls and Deciding How Far to Go

A few damaged boards or panels can be replaced, a failed section of caulk redone and a loose piece resecured, and the decision should rest on the condition of the walls. Staging the work by wall or by year spreads out the effort and lets the household plan, and the sequence of the work should be set from the beginning.

Carpenters, Painters and Other Trades on the Job

The lead carpenter or foreman usually directs the siding work and decides the order of the tasks, and clear coordination avoids gaps and overlaps. It is reasonable to ask who will be doing the work and how many people will be on the site, and a visit from the lead each day is a good habit.

Looking at Scope, Materials and Details

Notice how each proposal handles windows, doors, vents and fixtures, and the extras that might arise, and take notes on each conversation to compare later. Ask who will be on site each day, who is in charge, and how to reach that person, and a calm, careful decision beats a rushed one.

The Final Walk-Through and Closing Out

Make a list of any items that need correction, and have them written down with the contractor, and taking photographs of the finished walls is a good idea. Keep the care instructions for the siding, and learn how to wash and inspect it, and photographs behind the walls are rarely available otherwise.